Small details that make a home work better
Useful socket positions
We plan outlets around furniture, appliances and how each room will be used.
Coordination with other trades
Electrical stages can be timed around fitting, plastering and decorating.
Connected home security
CCTV and alarm supplies can be considered with the main electrical layout.
Home electrics fitted for the way you live
An extra socket is only useful if it's where you need it and suitable for the load you plan to connect. We carry out domestic electrical services for existing homes, renovations and new-build projects, including repairs, appliance connections and electrical work for kitchens and bathrooms. Before cables are run, we consider furniture, appliance positions, switching and future use. This practical planning helps avoid trailing leads, overloaded extensions and sockets hidden behind fitted units. We can also inspect existing circuits where a room change depends on older wiring being safe and suitable.


Electrical work planned around the wider job
Kitchen and bathroom improvements often involve several trades, so timing matters. We discuss where circuits can be accessed, when power may need isolating and which work must happen before plastering, cabinets or finishes are completed. Dedicated pages explain rewiring, lighting, consumer unit upgrades and formal inspection in more depth. If security is part of the same project, we can also plan home CCTV or an intruder alarm alongside the electrical work. You have one technical contact for the connected supplies, cables and equipment.
Frequently asked questions
Can you add sockets without rewiring the whole house?
Often, yes. We first assess the existing circuit, its condition and available capacity. The cable route and room finish also matter. If the current wiring isn't suitable, we'll explain the safer alternative before any installation begins.
Will the power need to be turned off during the job?
Usually, the relevant circuit needs safe isolation while we work. The length of the interruption depends on the task and the installation. We discuss this beforehand where possible, especially if you work from home or rely on powered equipment.
When should electrical work happen during a renovation?
Cable routes and outlet positions are best agreed early. First-fix wiring normally happens before plastering and fitted finishes, while switches, sockets and lights are fitted later. Early planning prevents freshly finished surfaces from being opened again.