Rewiring with fewer late surprises
Outlets planned early
Sockets, lights and fixed equipment are positioned before finishes restrict access.
Trades kept in sequence
First-fix and final fitting can be coordinated with plastering and joinery.
New circuits tested
The completed installation is checked and documented before normal use.
Plan the finished rooms before running cables
House rewiring is easier to get right when decisions are made before walls are closed and finishes are applied. We plan socket positions, lighting points, appliances, heating controls and security equipment around the completed property. This may be needed because wiring has aged, the existing layout is unsuitable or a major renovation will change electrical demand. Thinking ahead also allows for future equipment instead of building a brand-new extension with the same shortage of sockets as the room it replaced. We assess access and cable routes before setting out the work.


Understand the stages and likely disruption
First-fix work places cables before plastering and final finishes. Later, we return to fit switches, sockets, lights and other accessories once the rooms are ready. Rewiring involves access to walls, floors or ceilings, periods without power and coordination with plasterers and other trades. We discuss these practical points before work starts so the sequence is clear. After the wiring and accessories are installed, we test the circuits and complete the relevant documentation. The result is an installation planned for the property you intend to use.
Frequently asked questions
How disruptive is a full house rewire?
Rewiring requires access for new cables, which may involve floors, ceilings and wall routes. Power will be unavailable at certain stages, and plaster repairs may follow. Planning the sequence with other trades helps keep avoidable disruption down.
When should we choose socket and lighting positions?
Choose them before first-fix cabling begins. Use room plans, furniture positions and appliance details to decide what will be practical. Changes made after plastering or fitting can mean reopening finished surfaces and altering cable routes.
Can rewiring include alarms and other electrical systems?
Yes, security equipment, heating controls and other fixed electrical needs can be discussed during planning. Including their supplies and cable routes early usually creates a neater installation than adding them after the main finishes are complete.